Link Details

The entry point of a Continuous Delivery pipeline is its Commit Stage, and as such manages the compilation, unit testing, analysis, and packaging of source code whenever a change is committed to version control. As the commit stage is responsible for identifying defective code it represents a vital feedback loop for developers, and for that reason Dave Farley and Jez Humble recommend a commit stage that is “ideally less than five minutes and no more than ten” – if the build process is too slow or non-deterministic, the pace of development can soon grind to a halt.

Posted by bball  |   Jul 07 2014 / 14:16

Add your comment


Html tags not supported. Reply is editable for 5 minutes. Use [code lang="java|ruby|sql|css|xml"][/code] to post code snippets.

Recommended Links

Scala
Written by: Ryan Knight
Featured Refcardz: Top Refcardz:
  1. Apache Hadoop
  2. Play
  3. Akka
  4. Debugging JavaScript
  5. Design Patterns
  1. Apache Hadoop
  2. REST
  3. Java
  4. Git
  5. Java Performance
Connect with DZone