Link Details

Link 97379 thumbnail
User 276353 avatar

By javathreads
via java.sun.com
Published: Jul 24 2008 / 05:04

There are several different approaches to scheduling GC within a real-time environment, each with benefits and weaknesses. These include work-based and time-based incremental collection approaches, which are aimed at minimizing the effect of GC on scheduling.
  • 12
  • 0
  • 851
  • 225

Add your comment


Html tags not supported. Reply is editable for 5 minutes. Use [code lang="java|ruby|sql|css|xml"][/code] to post code snippets.