Link Details

Link 1034835 thumbnail
User 225256 avatar

By mswatcher
via telerik.com
Published: Sep 19 2013 / 10:48

For agile planning to work, you must have a prioritized and sized (estimated) backlog. A prioritized backlog is simply a list of work that needs to get done that is ordered by priority. Essentially, the work at the top of the list is the most important and should be done first. In many cases, customers have a difficult time prioritizing lists of features, however, this makes the prioritized backlog even more important to produce. Another requirement of this backlog is that each of the items must be sized, which is another way of saying that the item should have an estimate.
  • 10
  • 0
  • 843
  • 456

Add your comment


Html tags not supported. Reply is editable for 5 minutes. Use [code lang="java|ruby|sql|css|xml"][/code] to post code snippets.

Apache Hadoop
Written by: Piotr Krewski
Featured Refcardz: Top Refcardz:
  1. Play
  2. Akka
  3. Design Patterns
  4. OO JS
  5. Cont. Delivery
  1. Play
  2. Java Performance
  3. Akka
  4. REST
  5. Java